2017 Capital Improvement Plan

 2017 Street Program
This program includes the annual Street Repair Program and the annual Street Reconstruction Program. With this program, various streets throughout the village are repaired or reconstructed based on their current condition. Street reconstruction is a procedure in which the street is completely removed and a new street is constructed in its place. Street resurfacing is a procedure in which a new asphalt overlay is applied approximately two inches thick, providing a new, smooth, long-lasting driving surface. In addition, each year a list of streets receive a small overlay of micro-surface and/or other asphalt surface treatment materials to extend the useful life of the pavement.
Construction - Summer 2017
Contact Name : Brad Hurban
Subdivisions / Streets
ASPEN COURT|AUTUMN RIDGE|BEDFORD COURT|BROMLEY COURT|DESMOND DRIVE COURTS|LEXINGTON GREEN|MEACHAM ROAD|SIENNA DRIVE COURTS|STRATHMORE|TIMBERCREST WOODS|WEATHERSFIELD|WEATHERSFIELD LAKES|WEATHERSFIELD WAY COURTS|WICKHAM DRIVE